The 5 Options:

Option 1A

Entertainment District

  • 30’ B-B (10.5’ Lanes)

  • 8’ Parking Space (East)

  • 10’ Sidewalk w/ 5’ Tree Wells

Option 1B

Overall Concept

  • 24’ B-B (12’ Lanes)

  • 8’-10’ Sidewalk

  • 2’-4’ Landscape

Option 2

  • 12’ Travel Lanes

  • 3’ Vegetation Strip

  • 8’ – 10’ Share Use Path

  • Possible prevent removal of the majority of existing palm trees

Option 3

  • 11’ – 12’ Travel Lanes

  • 4’ Bike Lane (West)

  • 4’- 5’ Vegetation Strip

  • 5’ – 6’ Sidewalk

  • Remove all existing palms

Option 4

  • 11’ – 12’ Travel Lanes

  • 4’ Bike Lane (West)

  • 3’ Vegetation Strip

  • 5’ – 6’ Sidewalk

  • May save some existing palm trees

Option 5

  • 10’ – 11’ Travel Lanes

  • 4’ Bike Lane (East & West)

  • 5’-6’ Vegetation Strip

  • No Sidewalk (West)

  • Less than 10 existing palm trees to be relocated

We need your help, please complete the survey: