The 5 Options:
The 5 Options:
Option 1A
Option 1A
Entertainment District
30’ B-B (10.5’ Lanes)
8’ Parking Space (East)
10’ Sidewalk w/ 5’ Tree Wells
Option 1B
Option 1B
Overall Concept
24’ B-B (12’ Lanes)
8’-10’ Sidewalk
2’-4’ Landscape
Option 2
Option 2
12’ Travel Lanes
3’ Vegetation Strip
8’ – 10’ Share Use Path
Possible prevent removal of the majority of existing palm trees
Option 3
Option 3
11’ – 12’ Travel Lanes
4’ Bike Lane (West)
4’- 5’ Vegetation Strip
5’ – 6’ Sidewalk
Remove all existing palms
Option 4
Option 4
11’ – 12’ Travel Lanes
4’ Bike Lane (West)
3’ Vegetation Strip
5’ – 6’ Sidewalk
May save some existing palm trees
Option 5
Option 5
10’ – 11’ Travel Lanes
4’ Bike Lane (East & West)
5’-6’ Vegetation Strip
No Sidewalk (West)
Less than 10 existing palm trees to be relocated
We need your help, please complete the survey:
We need your help, please complete the survey: